Underground Cable Plant Assemblies
When you request additional power to your business, your existing cable may be insufficient for the demand power, and a new cable may be required for your business. As Polen Engineering, the most correct and economical cable selection is made by making the necessary cable calculation in accordance with the demand power. All necessary procedures are carried out by us until the cable reaches your establishment. When necessary, we offer turnkey solutions by carrying out excavation works by our expert team.
Thanks to the Low Voltage - Medium Voltage City Network installations, energy transmission starts from step-down transformer centers and is delivered to the end user via distribution transformers, cable and overhead power transmission lines. Polen Engineering provides service at every stage of the system with its experienced staff.